
THE project to develop Rothesay Pavilion into a cultural tourist destination has progressed to the next stage.
Extensive work on the project has already been carried out by Robertson Construction Central West, with the development first getting underway in 2023.
A temporary tent structure shielded the building from the elements, allowing for high-level structural repairs and the restoration of the caretaker’s building.
With this phase now complete, the project moves forward with structural enhancements on the lower ground floor and the installation of underground drainage. This stage will also see the restoration of the original box office to its bygone days and the renovation of the café area, offering views from the first floor.
As well as a major tourist attraction, Rothesay Pavilion is being reimagined as a hub for leisure, culture, and entertainment, and a driver for the local and wider economy. The pavilion is expected to create at least 14 direct local jobs, in addition to those generated during the construction phase, and inject millions into the local economy.
Upon reopening, it will feature an events space, office facilities, a caretaker’s house, flexible exhibition space, craft retail/café space, dressing rooms, a young people’s studio, and outdoor areas.
Elliot Robertson, chief executive officer at Robertson Group, said, “Having completed the works to make the pavilion wind and water tight, the project enters the second phase which will really see this historic building come back to life. The commitment shown by the council and funding partners, including support through the rural growth deal, reflects a bold and forward-thinking vision for what the pavilion can become, while preserving a significant piece of Scotland’s architectural heritage.
“Reimagined for contemporary audiences and users, it will not only serve as a vibrant tourist destination but also as a creative hub that brings long-term benefits to the local economy.”
Argyll and Bute Council leader councillor Jim Lynch added, “These are exciting times for the people of Rothesay, as well as Scotland’s cultural and architectural heritage. Rothesay Pavilion is an iconic art deco masterpiece, steeped in rich history. Situated at the heart of the town, it greets visitors arriving by ferry from Wemyss Bay and, once complete, it will be a valuable resource for day-to-day life in Rothesay, for visitors and residents alike.
“This project is about giving the building a modern-day role and creating opportunities for regeneration, cultural enrichment, and high-value job creation in Rothesay. Its reopening will drive the local economy and enhance daily life on Bute. Advancing to the next stage marks a significant milestone, and I am excited to see it progress.”
It is estimated that construction work could be complete by autumn 2026. The building will be managed by the Rothesay Pavilion Charity, a registered Scottish Charitable Incorporated Organisation (SCIO).